A build report: scorecard, software cards, network table, provisioning Gantt with a shaded reboot

Windows Server 2025 via Aria Automation, part 3: validation as a product, and the details that hurt

A self-contained HTML build report, down to a Gantt chart that spots the reboots. Plus the Session 0 traps, like mangled vmtoolsd arguments and ejecting an ISO with no Explorer, that cost real hours.

17 September 2026 · Updated 1 October 2026 · 7 min · Adam Stretton
Boot → check kill switch → skip flagged steps → run next step → reboot if required → repeat

Windows Server 2025 via Aria Automation, part 2: a state machine that survives four reboots

One script runs at every startup until the build is done. Flag files make each step run once, a state file keeps true timings across reboots, and at the end it cleans up, reports and deletes itself.

17 September 2026 · Updated 1 October 2026 · 6 min · Adam Stretton
Three layers: Aria control plane, cloudbase-init first boot, file-share build engine

Windows Server 2025 via Aria Automation, part 1: the pipeline

One catalog request, one fully built, domain-joined Windows Server 2025 with its agents, a validation report, and no trace of the tooling that built it. The three-layer design, and why each seam is where it is.

17 September 2026 · Updated 1 October 2026 · 11 min · Adam Stretton
Two provisioning paths side by side: IaaS engine to vCenter, vs blueprint to supervisor reconciliation

VM Apps vs All Apps: a field comparison of VCF Automation's two provisioning models

VCF Automation 9.1 has two provisioning models, as two kinds of organisation. I ran the same use cases through both, from Windows VMs to nested ESXi. The honest scorecard, and how each case is done.

16 September 2026 · Updated 1 October 2026 · 7 min · Adam Stretton